Hello everyone,
The LH2 and LOX piping installation on side 3 of the Launch Platform is mostly complete. Some brackets and the end flanges still need to be installed.
Regards,
George
Hello everyone,
The LH2 and LOX piping installation on side 3 of the Launch Platform is mostly complete. Some brackets and the end flanges still need to be installed.
Regards,
George
Hello everyone,
I was able to install the LH2 system pipes and brackets up to level 80 today. Work is slow now because I don't have many photos of side 3 of the real LUT
Regards,
George
Hi Gerge B,
ein Riesenwerk, das Du da gebaut hast. Ich habe das dingen vor 40 Jahren im Eigenbau in 1:100 gebaut und die Rakete dazu. Das war schon riesig groß. Aber in dem von dir gewählten Maßstab ist das eine Wucht ins Döschen.
M;it freundlichen Grüßen
modellschiff
Hello,
I complete construction of the main structure of the Milkstool. I must now design the top section.
To be continued............
Regards,
George
Hello,
For now side 3 LOX and LH2 piping is almost complete including the brackets and pipe flanges.
Regards,
George
Hi George,
thanks for sharing this awesome work.
Michael