Spent some time to finish glue all bolts in engine compartment and then came the time to put engine in!
Prepared some more details: two fuel filters, one unknown small tank and some strengthening bars.
To place engine and other parts easily, you need to do steps in right order.
First of all fuel filters
Then the engine, that attaches to firewall and seats on two floor mounts
(In retrospect, i think it was unnecessary to cut out the hole in firewall)
Finally all the bars and two hoses from air intakes to air filters.
Engine compartment is finished, except exhaust pipes, that will be attached in later stage
Errors:
Confusing part 95 - strip that holds little tank and confusing drawings how to attach it. Sorted out by improvising.
Though this model was printed with double side color where needed, some parts are luck of it, like parts 96,97,98. Painted myself.
Part 99 a little bit short in length. Painted white glue mark and glued on remained edge.